Case Studies.

This typical 5 bedroom timber frame house located on
the outskirts of Radstock, N.Somerset was designed
and manufactured at our Highbridge depot.

The"whole house" engineered structure including
external and internal wall panels, lintels, spandrel panels, Easi-Joist flooring system and Trussed Rafters was typically erected in 5 days. This proves the cost
effectiveness and time scale for Timber Frame construction.

Manderwood Timber Engineering can generally engineer, design and deliver a timber frame construction in approximately 4 weeks.

"Thank you for an excellent service. Delivery was made on time with a quality product. Also, thank you for providing an excellent after-sales service."

K.M.Homes Ltd.